Although efforts have been made to match the database text to the official legal text they represent, substantive errors or differences may remain. It is the user’s responsibility to verify the legal accuracy of all legal text. The Legislative Counsel Committee claims copyright protection in those parts of Oregon Revised Statutes that are legally subject to copyright protection. The State of Oregon is not liable for any loss or damage resulting from errors introduced into the materials supplied by the Legislative Counsel Committee, by a user or any third party, or resulting from any defect in or misuse of any search software, drivers or other equipment.

Hint: Use your browser's Find feature (usually found in the Edit menu) to get to a section more quickly.


Chapter 757 — Utility Regulation Generally

2001 EDITION

GENERAL PROVISIONS

757.005 Definitions. (1)(a) As used in this chapter, except as provided in paragraph (b) of this subsection, "public utility" means:

(A) Any corporation, company, individual, association of individuals, or its lessees, trustees or receivers, that owns, operates, manages or controls all or a part of any plant or equipment in this state for the production, transmission, delivery or furnishing of heat, light, water or power, directly or indirectly to or for the public, whether or not such plant or equipment or part thereof is wholly within any town or city. "Public utility" includes a privately owned water utility that provides wastewater services to the public inside the boundaries of a city, either directly or through an affiliate, regardless of the number of customers receiving wastewater services.

(B) Any corporation, company, individual or association of individuals, which is party to an oral or written agreement for the payment by a public utility, for service, managerial construction, engineering or financing fees, and having an affiliated interest with the public utility.

(b) As used in this chapter, "public utility" does not include:

(A) Any plant owned or operated by a municipality.

(B) Any railroad, as defined in ORS 824.020, or any industrial concern by reason of the fact that it furnishes, without profit to itself, heat, light, water or power to the inhabitants of any locality where there is no municipal or public utility plant to furnish the same.

(C) Any corporation, company, individual or association of individuals providing heat, light or power:

(i) From any energy resource to fewer than 20 customers, if it began providing service to a customer prior to July 14, 1985;

(ii) From any energy resource to fewer than 20 residential customers so long as the corporation, company, individual or association of individuals serves only residential customers;

(iii) From solar or wind resources to any number of customers; or

(iv) From biogas, waste heat or geothermal resources for nonelectric generation purposes to any number of customers.

(D) A qualifying facility on account of sales made under the provisions of ORS 758.505 to 758.555.

(E) Any water utility serving less than 300 customers at an average annual residential rate of $18 per month or less that provides adequate and nondiscriminatory service and that does not provide wastewater services.

(F) Any person furnishing heat, but not delivering electricity or natural gas to its customers, except:

(i) As provided in ORS 757.007 and 757.009; or

(ii) With respect to heat furnished in municipalities which on January 1, 1989, had a municipally owned system that was furnishing steam or other thermal forms of heat to its customers.

(G) Notwithstanding subparagraph (F) of this paragraph, any corporation, company, partnership, individual or association of individuals furnishing heat to a single thermal end user from an electric generating facility, plant or equipment that is physically interconnected with the single thermal end user.

(H) Any corporation, company, partnership, individual or association of individuals that furnishes natural gas, electricity, ethanol, methanol, methane, biodiesel or other alternative fuel to any number of customers for use in motor vehicles and does not furnish any utility service described in paragraph (a) of this subsection.

(I) An electricity service supplier, as defined in ORS 757.600.

(2) Nothing in subsection (1)(b)(C) of this section shall prohibit third party financing of acquisition or development by a utility customer of energy resources to meet the heat, light or power requirements of that customer. [Amended by 1953 c.583 §2; 1967 c.241 §1; 1967 c.314 §1; 1971 c.655 §64a; 1973 c.726 §1; 1979 c.62 §1; 1981 c.360 §1; 1981 c.749 §21; 1983 c.118 §1; 1983 c.799 §7; 1985 c.550 §1; 1985 c.633 §7; 1985 c.779 §1; 1987 c.447 §96; 1987 c.900 §3; 1989 c.5 §2; 1989 c.999 §§1,2; 1991 c.294 §1; 1995 c.267 §1; 1999 c.330 §2; 1999 c.491 §1; 1999 c.865 §21; 2001 c.104 §292]

757.007 Contract and rate schedule filing for certain furnishers of heat exempt from regulation; procedure. (1) Every person exempt from regulation under ORS 757.005 (1)(b)(F) shall file with the Public Utility Commission, not later than 30 days prior to their effective date, all contracts and schedules establishing rates, terms and conditions for the provision of heating services.

(2) Prior to the effective date, the commission may suspend the effective date of such contracts or schedules for an additional period of not more than 120 days in order to determine the reasonableness of such contracts or schedules, taking into consideration the services being provided, the costs and risks of service, the availability and costs of alternative forms of service and other reasonable considerations, including the impact on existing customers of the utilities furnishing electricity and natural gas and on the public generally.

(3) If the contract or schedule is not suspended, or if the contract or schedule is determined reasonable by the commission after suspension, the contract or schedule shall not be subject to further commission review during its term or such other period as the commission may specify, except as provided in ORS 757.009.

(4) In any proceeding before the commission to determine the reasonableness of contracts or schedules proposed under this section, the burden shall be upon the proponent of the contract or schedule to establish its reasonableness. [1989 c.999 §§4a,4c]

757.009 Procedure for reregulation of furnishers of heat. (1) Except as provided in subsection (2) of this section, the Public Utility Commission may, upon written complaint or upon the commission’s own motion, regulate, under ORS 757.205 to 757.240, or any part thereof, any person otherwise exempt from regulation under ORS 757.005 (1)(b)(F) as follows:

(a) With respect to any or all customers, if the commission finds that the activities of such person have an adverse effect upon the customers of public utilities furnishing electricity or natural gas and the benefits of such regulation outweigh any adverse effect on the public generally; or

(b) With respect to any customer receiving service not exceeding 500 million British thermal units per year or any residential customer, if the commission finds that such person has engaged in unjust or unreasonable practices with respect to the services or rates available to the customer and the customer has no reasonable alternative to the services provided.

(2) The commission shall not regulate persons under subsection (1)(a) of this section with respect to contracts that became effective prior to the date of service of the complaint or with respect to heating systems already in place on the date of service of the complaint if the commission determines that continued expansion will increase the efficiency of those systems. [1989 c.999 §§4b,4d]

757.010 [Repealed by 1971 c.655 §250]

757.015 "Affiliated interest" defined. As used in ORS 757.105 (1) and in ORS 757.495, "affiliated interest" with a public utility means:

(1) Every corporation and person owning or holding directly or indirectly five percent or more of the voting securities of such public utility.

(2) Every corporation and person in any chain of successive ownership of five percent or more of voting securities of such public utility.

(3) Every corporation five percent or more of whose voting securities are owned by any person or corporation owning five percent or more of the voting securities of such public utility or by any person or corporation in any chain of successive ownership of five percent or more of voting securities of such public utility.

(4) Every person who is an officer or director of such public utility or of any corporation in any chain of successive ownership of five percent or more of voting securities of such public utility.

(5) Every corporation which has two or more officers or two or more directors in common with such public utility.

(6) Every corporation and person, five percent or more of which is directly or indirectly owned by a public utility.

(7) Every corporation or person which the Public Utility Commission determines as a matter of fact after investigation and hearing actually is exercising any substantial influence over the policies and actions of such public utility, even though such influence is not based upon stockholding, stockholders, directors or officers to the extent specified in this section.

(8) Every person or corporation who or which the commission determines as a matter of fact, after investigation and hearing, actually is exercising such substantial influence over the policies and actions of such public utility in conjunction with one or more other corporations or persons with whom they are related by ownership or blood or by action in concert that together they are affiliated with such public utility within the meaning of this section even though no one of them alone is so affiliated. [Amended by 1971 c.655 §65; 1989 c.17 §1]

757.020 Duty of utilities to furnish adequate and safe service at reasonable rates. Every public utility is required to furnish adequate and safe service, equipment and facilities, and the charges made by any public utility for any service rendered or to be rendered in connection therewith shall be reasonable and just, and every unjust or unreasonable charge for such service is prohibited. [Amended by 1971 c.655 §66]

757.025 [Amended by 1971 c.655 §14; renumbered 756.062]

757.030 [Repealed by 1971 c.655 §250]

757.035 Adoption of safety rules and regulations; enforcement. (1) The Public Utility Commission has power, after a hearing had upon the motion of the commission or upon complaint, to require by general or special orders embodying reasonable rules or regulations, every person or municipality, their agents, lessees or acting trustees or receivers, appointed by court, engaged in the management, operation, ownership or control of telegraph, telephone, signal or power lines within this state, upon the public streets or highways, and also upon all other premises used, whether leased, owned or controlled by them, to construct, maintain and operate every line, plant, system, equipment or apparatus in such manner as to protect and safeguard the health and safety of all employees, customers and the public, and to this end to adopt and prescribe the installation, use, maintenance and operation of appropriate safety or other devices, or appliances, to establish or adopt standards of construction or equipment, and to require the performance of any other act which seems to the commission necessary or proper for the protection of the health or safety of all employees, customers or the public.

(2) When acting pursuant to subsection (1) of this section, the Public Utility Commission shall adopt by rule as the standard of such construction, operation and maintenance the 1973 edition of the American National Standard, National Electrical Safety Code, C2.

(3) In lieu of subsection (2) of this section, or in addition thereto, the commission may adopt by rule any revision or edition of or amendment to the National Electrical Safety Code approved by the American National Standards Institute after July 14, 1977, and in effect on the date of adoption by the commission. [Amended by 1969 c.530 §1; 1971 c.655 §68; 1975 c.658 §1; 1977 c.346 §1]

757.039 Regulation of hazardous substance distribution and storage operations; cooperation with federal agencies; disclosure of reports and information. (1) As used in this section, "hazardous substance or material" means:

(a) Fuel gas, whether in a gaseous, liquid or semisolid state;

(b) Petroleum or petroleum products; and

(c) Any other substance or material which may pose an unreasonable risk to life or property when transported by pipeline facilities.

(2) The Public Utility Commission has power, after a hearing had upon the commission’s own motion or upon complaint, to require by general or special orders embodying reasonable rules, every person or municipality, their agents, lessees or acting trustees or receivers, appointed by court, engaged in the management, operation, ownership or control of facilities for the transmission or distribution of a hazardous substance or material by pipeline; or of facilities for the storage or treatment of a hazardous substance or material to be transmitted or distributed by pipeline or upon the public streets or highways; or of any other premises used, whether leased, owned or controlled by them, to construct, maintain and operate every pipeline, plant, system, equipment or apparatus used in the transmission, distribution, storage or treatment of a hazardous substance or material to be transmitted by pipeline or upon the public streets or highways in such manner as to protect and safeguard the health and safety of all employees, customers and the public, and to this end to adopt and prescribe the installation, use, maintenance and operation of appropriate safety or other devices, or appliances, to establish or adopt standards of construction or equipment, and to require the performance of any other act which seems to the commission necessary or proper for the protection of the health and safety of all employees, customers or the public.

(3) The commission is authorized to cooperate with, make certifications to and enter into agreements with the Secretary of Transportation of the United States of America and to assume responsibility for, and carry out on behalf of the Secretary of Transportation, safety jurisdiction relating to pipeline facilities and transportation of hazardous substances and materials in Oregon in any manner not otherwise subject to the jurisdiction of any other agency of this state.

(4) Notwithstanding any other provisions to the contrary, the commission shall make public such reports as are required to be made public under applicable federal law and regulations and provide such information as is required by the Secretary of Transportation.

(5) The jurisdiction of the commission over propane, butane or mixtures of these gases shall be limited to systems transporting such gases to 10 or more customers, or to systems any portion of which is located in a public place. [Formerly 757.095; 1983 c.540 §3; 2001 c.35 §1]

757.040 [Amended by 1971 c.655 §101; renumbered 758.035]

757.045 [Amended by 1967 c.394 §1; repealed by 1971 c.781 §1]

757.050 Authority of commission to order extension of service to unserved areas. The Public Utility Commission has power to require any public utility, after a public hearing of all parties interested, to extend its line, plant or system into, and to render service to, a locality not already served when the existing public convenience and necessity requires such extension and service. However, no such extension of service shall be required until the public utility has been granted such reasonable franchises as may be necessary for the extension of service, and unless the conditions are such as to reasonably justify the necessary investment by the public utility in extending its line, plant or system into such locality and furnishing such service. [Amended by 1971 c.655 §67]

757.055 [Repealed by 1971 c.655 §250]

757.056 Information on energy conservation to be furnished by certain utilities. (1) As used in this section, "energy conservation services" means services provided by public utilities to educate and inform customers and the public about energy conservation. Such services include but are not limited to providing answers to questions concerning energy saving devices and providing inspections and making suggestions concerning the construction and siting of buildings and residences.

(2) All public utilities as defined in ORS 757.005, that produce, transmit, deliver or furnish heat, light or power shall establish energy conservation services and shall provide energy conservation information to customers and to the public. The services shall be performed in accordance with such rules as the Public Utility Commission may prescribe. [1977 c.197 §2; 1977 c.887 §11]

757.060 [Amended by 1955 c.145 §1; repealed by 1961 c.691 §20]

757.061 Water utility exemption from certain financial regulations; rules; conditions; maximum rates established by commission. (1) ORS 757.105 to 757.110, 757.135, 757.140, 757.205 to 757.220, 757.400 to 757.460 and 757.480 to 757.495 do not apply to a water utility serving fewer than 500 customers unless:

(a) Twenty percent or more of the customers of the water utility file a petition with the Public Utility Commission requesting that the water utility not be exempt from regulation under the statutes set forth in this subsection; and

(b) A rate charged by the water utility for water service exceeds maximum rates established by the commission under subsection (2) of this section.

(2) The commission shall adopt rules establishing maximum rates for water utilities serving fewer than 500 customers for the purpose of determining whether such utilities are subject to regulation under the statutes set forth in subsection (1) of this section.

(3) Not less than 60 days before a water utility serving fewer than 500 customers increases any rate to exceed any maximum rate prescribed under subsection (2) of this section, it shall provide written notice to all of its customers advising the customers of their right to file a petition under subsection (1)(a) of this section. The commission shall adopt rules prescribing the content of the written notice.

(4) Notwithstanding subsection (1) of this section, ORS 757.105 to 757.110, 757.135, 757.140, 757.205 to 757.220, 757.400 to 757.460 and 757.480 to 757.495 shall apply to a privately owned water utility that provides wastewater services to the public inside the boundaries of a city, either directly or through an affiliate, regardless of the number of customers receiving wastewater services. [1989 c.403 §2; 1999 c.330 §1]

757.065 [Renumbered 756.370]

757.070 [Renumbered 756.375]

757.075 [Repealed by 1971 c.655 §250]

757.080 [1953 c.356 §1; 1961 c.354 §1; 1971 c.655 §30a; renumbered 756.380]

757.085 [1953 c.356 §2; 1961 c.354 §2; renumbered 756.385]

757.090 [1953 c.356 §3; 1961 c.354 §3; renumbered 756.390]

757.095 [1969 c.372 §2; 1971 c.655 §69; renumbered 757.039]

BUDGET, ACCOUNTS AND REPORTS OF UTILITIES

757.105 Filing of budget; review by commission; pensions as operating expenses. (1) The Public Utility Commission has the right and power of regulation, restriction and control over the budgets of expenditures of public utilities, as to all items covering:

(a) Proposed payment of salaries of executive officers;

(b) Donations;

(c) Political contributions and political advertising;

(d) Expenditures for pensions or for a trust to provide pensions for employees and officers;

(e) Other expenditures and major contracts for the sale or purchase of equipment; and

(f) Any payment or contemplated payment to any person or corporation having an affiliated interest for service, advice, auditing, associating, sponsoring, engineering, managing, operating, financing, legal or other services.

(2) On or before November 1 of each year each public utility shall prepare a budget showing the amount of money which, in its judgment, shall be needed during the ensuing year for covering all such activities and expenditures, and file it with the commission.

(3) When any such budget has been filed with the commission, the commission shall examine into and investigate the same and unless rejected within 60 days thereafter, the proposed budget is presumptively fair and reasonable and not contrary to public interest.

(4) Proposed expenditures for pensions or for a trust to provide pensions for the employees and officers of such utility whether for future service or past service or both, shall be recognized as an operating expense if the trust fund is irrevocably committed to the payment of pensions or benefits to employees and if such pensions are reasonable and nondiscriminatory. The commission may disallow as an operating expense any expenditure for pension purposes in excess of the amount necessary and proper to maintain an actuarially sound retirement plan for the employees of the utility in Oregon. [Amended by 1957 c.593 §1; 1971 c.655 §82]

757.107 Supplemental budgets and orders. Adjustment and additions to such budget expenditures may be made from time to time during the year by filing supplementary budgets with the Public Utility Commission. The provisions of ORS 757.105 (3) apply to adjustments and additions to budgets. [Amended by 1971 c.655 §83]

757.110 Effect of budget orders. (1) Any finding and order made and entered by the Public Utility Commission under ORS 757.105 or 757.107, shall have the effect of prohibiting any unapproved or rejected expenditure from being recognized as an operating expense or capital expenditure in any rate valuation proceeding or in any proceeding or hearing unless and until the propriety thereof has been established to the satisfaction of the commission. Any such finding and order shall remain in full force and effect, unless and until it is vacated and set aside in a suit brought and prosecuted as provided in ORS 756.580 to 756.610 or modified or set aside by the commission.

(2) Nothing in ORS 757.105 or 757.107 prevents the commission from at any time making and filing orders rejecting imprudent and unwise expenditures or payments. Such orders when so made shall be in full force and effect, and the public utility shall not have the right to make such expenditures or payments found to be imprudent or unwise until the order has been vacated or set aside in a suit brought and prosecuted as provided in ORS 756.580 to 756.610 or modified or set aside by the commission. [Amended by 1971 c.655 §84]

757.115 [Amended by 1971 c.655 §20; renumbered 756.105]

757.120 Accounts required. (1) Every public utility shall keep and render to the Public Utility Commission, in the manner and form prescribed by the commission, uniform accounts of all business transacted. All forms of accounts which may be prescribed by the commission shall conform as nearly as practicable to similar forms prescribed by federal authority.

(2) Every public utility engaged directly or indirectly in any other business than that of a public utility shall, if required by the commission, keep and render separately to the commission, in like manner and form, the accounts of all such other business, in which case all the provisions of this chapter shall apply with like force and effect to the accounts and records of such other business. [Amended by 1971 c.655 §85]

757.125 Duty of utility to keep records and accounts; duty of commission to furnish blanks. (1) The Public Utility Commission shall prescribe the accounts and records required to be kept, and every public utility is required to keep and render its accounts and records accurately and faithfully in the manner prescribed by the commission and to comply with all directions of the commission relating to such accounts and records.

(2) No public utility shall keep any other accounts or records of its public utility business transacted than those prescribed or approved by the commission except such as may be required by the laws of the United States.

(3) The commission shall cause to be prepared suitable blanks for reports for carrying out the purposes of this chapter, and shall, when necessary, furnish such blanks for reports to each public utility. [Amended by 1971 c.655 §86]

757.130 [Repealed by 1971 c.655 §250]

757.135 Closing accounts and filing balance sheet; auditing accounts. (1) Except as provided in subsection (2) of this section, the accounts required under ORS 757.120 and 757.125 shall be closed annually on December 31 and a balance sheet of that date promptly taken therefrom. On or before April 1 following, such balance sheet, together with such other information as the Public Utility Commission shall prescribe, verified by an officer of the public utility, shall be filed with the commission.

(2) If a public utility maintains its accounts and records on a fiscal year basis, the accounts required by ORS 757.120 and 757.125 shall be closed annually on the last day of the fiscal year and a balance sheet shall be promptly taken from those accounts. On or before the first day of the fourth month following the end of the public utility’s fiscal year, the balance sheet together with such information as the commission shall prescribe must be verified by an officer of the public utility and filed with the commission. The commission may require that a public utility filing information at the time specified in this subsection also file with the commission on a calendar year basis such additional information as may be prescribed by the commission.

(3) The commission may examine and audit any account. Items shall be allocated to the accounts in the manner prescribed by the commission. [Amended by 1983 c.540 §4; 2001 c.733 §1]

Note: Section 2, chapter 733, Oregon Laws 2001, provides:

Sec. 2. Any public utility that maintains its accounts and records on a fiscal year basis and that is required to file a balance sheet with the Public Utility Commission under the provisions of ORS 757.135 (1999 Edition) on or before April 1, 2002, must also file a balance sheet together with such information as the commission may prescribe under the provisions of ORS 757.135, as amended by section 1 of this 2001 Act, on or before the first day of the fourth month following the end of the public utility’s fiscal year in 2002. [2001 c.733 §2]

757.140 Depreciation accounts; use of certain undepreciated investment in rates. (1) Every public utility shall carry a proper and adequate depreciation account. The Public Utility Commission shall ascertain and determine the proper and adequate rates of depreciation of the several classes of property of each public utility. The rates shall be such as will provide the amounts required over and above the expenses of maintenance, to keep such property in a state of efficiency corresponding to the progress of the industry. Each public utility shall conform its depreciation accounts to the rates so ascertained and determined by the commission. The commission may make changes in such rates of depreciation from time to time as the commission may find to be necessary.

(2) In the following cases the commission may allow in rates, directly or indirectly, amounts on the utility’s books of account which the commission finds represent undepreciated investment in a utility plant, including that which has been retired from service:

(a) When the retirement is due to ordinary wear and tear, casualties, acts of God, acts of governmental authority; or

(b) When the commission finds that the retirement is in the public interest. [Amended by 1971 c.655 §87; 1989 c.956 §2]

757.145 [Repealed by 1971 c.655 §250]

757.150 [Repealed by 1971 c.655 §250]

757.155 [Amended by 1971 c.655 §90; renumbered 757.480]

757.160 [Amended by 1971 c.655 §91; renumbered 757.485]

757.165 [Amended by 1971 c.655 §92; renumbered 757.490]

757.170 [Amended by 1971 c.655 §93; renumbered 757.495]

757.175 [Amended by 1971 c.655 §94; renumbered 757.500]

757.180 [Amended by 1971 c.655 §21; renumbered 756.115]

RATE SCHEDULES; MEASURING EQUIPMENT

757.205 Filing schedules with commission; data filed with schedules. (1) Every public utility shall file with the Public Utility Commission, within a time to be fixed by the commission, schedules which shall be open to public inspection, showing all rates, tolls and charges which it has established and which are in force at the time for any service performed by it within the state, or for any service in connection therewith or performed by any public utility controlled or operated by it.

(2) Every public utility shall file with and as part of every such schedule all rules and regulations that in any manner affect the rates charged or to be charged for any service. Every public utility shall also file with the commission copies of interstate rate schedules and rules and regulations issued by it or to which it is a party.

(3) Where a schedule of joint rates or charges is or may be in force between two or more public utilities, such schedules shall in like manner be printed and filed with the commission. [Amended by 1971 c.655 §70]

Note: Section 21, chapter 683, Oregon Laws 2001, provides:

Sec. 21. (1) Notwithstanding any other provision of this chapter [ORS chapter 757], a customer of a public utility that entered into a contract with the public utility before the effective date of this 2001 Act [June 28, 2001], and that under the terms of the contract is not paying for electricity based on a market index price on the effective date of this 2001 Act, but would be required, on or after October 1, 2001, to pay for electricity based on a market index price for wholesale power or a market-based rate for a specific time period, may elect to pay for electricity from the public utility pursuant to the terms of any tariff rate that the public utility offers to other customers who have similar load characteristics.

(2) An election under this section may be made only for the period beginning on January 1, 2002, and ending on December 31, 2003.

(3) The provisions of this section do not apply to customers of a municipal electric utility, a people’s utility district or an electric cooperative. [2001 c.683 §21]

757.210 Hearing to establish new schedules; alternative regulation plan. (1) Whenever any public utility files with the Public Utility Commission any rate or schedule of rates stating or establishing a new rate or schedule of rates or increasing an existing rate or schedule of rates, the commission may, either upon written complaint or upon the commission’s own initiative, after reasonable notice, conduct a hearing to determine the propriety and reasonableness of such rate or schedule. The commission shall conduct such a hearing upon written complaint filed by the utility, its customer or customers, or any other proper party within 60 days of the utility’s filing; provided that no hearing need be held if the particular rate change is the result of an automatic adjustment clause. At such hearing the utility shall bear the burden of showing that the rate or schedule of rates proposed to be established or increased or changed is just and reasonable. The term "automatic adjustment clause" means a provision of a rate schedule which provides for rate increases or decreases or both, without prior hearing, reflecting increases or decreases or both in costs incurred or revenues earned by a utility and which is subject to review by the commission at least once every two years.

(2)(a) Subsection (1) of this section does not apply to rate changes under an approved alternative form of regulation plan, including a resource rate plan under ORS 757.212.

(b) Any alternative form of regulation plan shall include provisions to ensure that the plan operates in the interests of utility customers and the public generally and results in rates that are just and reasonable and may include provisions establishing a reasonable range for rate of return on investment. In approving a plan, the commission shall, at a minimum, consider whether the plan:

(A) Promotes increased efficiencies and cost control;

(B) Is consistent with least-cost resources acquisition policies;

(C) Is consistent with maintenance of safe, adequate and reliable service; and

(D) Is beneficial to utility customers generally, for example, by minimizing utility rates.

(c) As used in this subsection, "alternative form of regulation plan" means a plan adopted by the commission upon petition by a public utility, after notice and an opportunity for a hearing, that sets rates and revenues and a method for changes in rates and revenues using alternatives to cost-of-service rate regulation.

(d) Prior to implementing a rate change under an alternative form of regulation plan, the utility shall present a report that demonstrates the calculation of any proposed rate change at a public meeting of the commission.

(3) Except as provided in ORS 757.212, the commission, at any time, may order a utility to appear and establish that any, or all, of its rates in a plan authorized under subsection (2) of this section are in conformity with the plan and are just and reasonable. Except as provided in ORS 757.212, such rates, and the alternative form of regulation plan under which the rates are set, also shall be subject to complaint under ORS 756.500.

(4) Periodically, but not less often than every two years after the implementation of a plan referred to in subsection (2) of this section, the commission shall submit a report to the Legislative Assembly that shows the impact of the plan on rates paid by utility customers.

(5) The commission and staff may consult at any time with, and provide technical assistance to, utilities, their customers, and other interested parties on matters relevant to utility rates and charges. If a hearing is held with respect to a rate change, the commission’s decisions shall be based on the record made at the hearing. [Amended by 1971 c.655 §70a; 1981 c.715 §1; 1985 c.550 §2; 1987 c.447 §97; 1987 c.613 §1; 1989 c.5 §§3,23; 1995 c.785 §1; 2001 c.913 §3]

757.212 Resource rate plans; customers who may elect to be exempt; order approving plan; effect of approving plan. (1) For purposes of this section:

(a) "Resource rate plan" means a plan by a public utility to construct a generating plant or to enter into a wholesale power purchase or sales agreement with a term that is longer than one year.

(b) "Site" means:

(A) Buildings or other related structures that are interconnected by facilities owned by a single public utility customer and that are served through a single electric meter; or

(B) A single contiguous area of land containing buildings or other structures that are separated by not more than 1,000 feet, such that:

(i) Each building or structure included in the site is not more than 1,000 feet from at least one other building or structure in the site;

(ii) Buildings and structures in the site, and land containing and connecting buildings and structures in the site, are owned by a public utility customer who is billed for electricity use at the buildings and structures; and

(iii) Land shall be considered to be contiguous even if there is an intervening public or railroad right of way, provided that rights-of-way land on which municipal infrastructure facilities exist, such as street lighting, sewerage transmission and roadway controls, shall not be considered contiguous.

(2) The Public Utility Commission may approve a resource rate plan as an alternative form of regulation plan under ORS 757.210. A public utility must make a separate tariff filing for each proposed resource rate plan. If the commission approves a resource rate plan by a public utility based on the construction of a generating plant, the order approving the plan must state how the commission will reflect the costs and revenues of the generating plant in the utility’s rates during all or a portion of the expected useful life of the generating plant. If the commission approves a resource rate plan based on a wholesale power purchase or sales agreement with a term longer than one year, the order approving the plan must state how the commission will reflect the costs and revenues under the wholesale power purchase or sales agreement in the utility’s rates during all or a portion of the term of the agreement.

(3) A customer receiving electricity from a public utility may elect to be exempt from the costs and benefits of a resource rate plan for any single site at which the customer has had a peak load in excess of nine megawatts in any hour during the 12-month period immediately preceding the date on which the public utility files a tariff under this section. A public utility filing a tariff under this section must give written notice of the provisions of this subsection to all of its customers that are eligible to make an election under this subsection. The notice must be given within three days after the tariff is filed. An election under this subsection must be made by a customer within 30 days after the tariff is filed.

(4) A public utility customer that elects to be exempt under subsection (3) of this section may also elect to be exempt from the costs and benefits of a resource rate plan for any single site at which the customer has had a peak load in excess of one megawatt in any hour during the 12-month period immediately preceding the date on which the public utility files a tariff under this section. An election under this subsection must be made as part of the election under subsection (3) of this section.

(5) The commission shall ensure that customers making an election under subsection (3) or (4) of this section are charged the market cost for all electricity that is required to replace the electricity that would otherwise have been provided under the resource rate plan, and that the election does not result in increased costs or risks to the public utility or to other customers of the public utility.

(6) The commission, by rule, may allow customers of a public utility other than those customers described in subsection (3) of this section to elect to be exempt from the costs and benefits of a resource rate plan.

(7) If the commission approves a resource rate plan, the order of the commission must also address:

(a) The extent to which the public utility will use power from the generating plant or from the power purchase or sales agreement to serve its retail customers in Oregon;

(b) The allocation of power available from the generating plant or power purchase or sales agreement among different classes of the public utility’s customers;

(c) The ratemaking consequences of the generating plant or power purchase or sales agreement, including the consequences of variations in the amount of power that is actually available after the plan is in operation compared with the amount of power that was anticipated to be available at the time the plan was approved; and

(d) Any other issue the commission chooses to consider.

(8) If the commission approves a resource rate plan, the commission may not thereafter review the costs and rates specific to the resource rate plan or other obligations of the public utility under the plan, or consider any complaint under ORS 756.500 seeking review of the costs and rates specific to the resource rate plan or other obligations of the public utility under the plan, except for the purpose of determining whether the public utility is in compliance with the plan and has established rates in accordance with the plan.

(9) A resource rate plan and a public utility’s rates under a resource rate plan are not subject to ORS 757.355.

(10) The commission may not vacate or amend an order approving a resource rate plan unless the public utility operating under the plan approves the vacation or amendment.

(11) Notwithstanding ORS 756.580, any appeal of a commission order disapproving or approving a resource rate plan must be pursuant to the provisions of ORS 183.482. [2001 c.913 §2]

Note: Section 4, chapter 913, Oregon Laws 2001, provides:

Sec. 4. The Public Utility Commission may not approve resource rate plans under section 2 of this 2001 Act [757.212] for generation resources or power purchase or sales agreements that have been included in rates of the public utility before the effective date of this 2001 Act [August 3, 2001]. [2001 c.913 §4]

Note: 757.212 was added to and made a part of 757.205 to 757.220 by legislative action but was not added to any smaller series therein. See Preface to Oregon Revised Statutes for further explanation.

757.215 Commission authorized to suspend new rates or order interim rates during hearings; revenues collected under unapproved rates to be refunded; order after hearing. (1) The Public Utility Commission may, pending such investigation and determination, order the suspension of the rate or schedule of rates, provided the initial period of suspension shall not extend more than six months beyond the time when such rate or schedule would otherwise go into effect. If the commission finds that the investigation will not be completed at the expiration of the initial suspension, the commission may enter an order further suspending such rate or schedule for not more than three months beyond the last day of the initial suspension.

(2) This section does not prevent the commission and the utility from entering into a written stipulation at any time extending any period of suspension.

(3) After full hearing, whether completed before or after such rate or schedule has gone into effect, the commission may make such order in reference thereto as would be proper in a proceeding initiated after such rate or schedule has become effective.

(4) If the commission is required to or determines to conduct a hearing on a rate or schedule of rates filed pursuant to ORS 757.210, but does not order a suspension thereof, any increased revenue collected by the utility as a result of such rate or rate schedule becoming effective shall be received subject to being refunded. If the rate or rate schedule thereafter approved by the commission is for a lesser increase or for no increase, the utility shall refund the amount of revenues received that exceeds the amount approved as nearly as possible to the customers from whom such excess revenues were collected, by a credit against future bills or otherwise, in such manner as the commission orders.

(5) The commission may in a suspension order authorize an interim rate or rate schedule under which the utility’s revenues will be increased by an amount deemed reasonable by the commission, not exceeding the amount requested by the utility. Any such interim increase for a public utility as defined in ORS 757.005 that produces, transmits, delivers or furnishes heat, light or power shall be effected by rates designed to increase the utility’s revenues without materially changing the revenue relationships among customer classes or between the revenues derived from demand charges and from energy charges. An interim rate or rate schedule shall remain in effect until terminated by the commission. Upon completion of the hearing and decision, the commission shall order the utility to refund that portion of the increase in the interim rate or schedule that the commission finds is not justified. Any refund of an interim increase under this subsection shall be based upon an analysis of the utility’s earnings for a period reasonably representative of the period during which the interim increase was in effect. Refunds shall be made as nearly as possible to the customers against whom the interim rates were charged, by credits against future bills or in such other manner as the commission orders.

(6) Refunds ordered by the commission under subsection (4) or (5) of this section shall include interest on the amount determined to be subject to refund from the date such interim rate or rate schedules took effect. [Amended by 1981 c.715 §2; 1991 c.964 §1]

757.220 Notice of schedule changes required; exception for alternative regulation. No change shall be made in any schedule, including schedules of joint rates, except upon 30 days’ notice to the Public Utility Commission. All changes shall be plainly indicated upon existing schedules, or by filing new schedules in lieu thereof 30 days prior to the time they are to take effect. However, the commission, for good cause shown, may allow changes without requiring the 30 days’ notice by filing an order specifying the changes to be made and the time when they shall take effect. This section does not apply to rate changes authorized under an alternative form of regulation plan under ORS 757.210 (2). [Amended by 1995 c.785 §2]

757.225 Utilities required to collect for their services in accordance with schedules. No public utility shall charge, demand, collect or receive a greater or less compensation for any service performed by it within the state, or for any service in connection therewith, than is specified in printed rate schedules as may at the time be in force, or demand, collect or receive any rate not specified in such schedule. The rates named therein are the lawful rates until they are changed as provided in ORS 757.210 to 757.220. [Amended by 1971 c.655 §71; 1985 c.550 §3; 1991 c.67 §204]

757.230 Control of commission over classification of services and forms of schedules. (1) The Public Utility Commission shall provide for a comprehensive classification of service for each public utility, and such classification may take into account the quantity used, the time when used, the purpose for which used, the existence of price competition or a service alternative, the services being provided, the conditions of service and any other reasonable consideration. Based on such considerations the commission may authorize classifications or schedules of rates applicable to individual customers or groups of customers. The service classifications and schedule forms shall be designed consistently with the requirements of ORS 469.010. Each public utility is required to conform its schedules of rates to such classification. If the commission determines that a tariff filing under ORS 757.205 results in a rate classification primarily related to price competition or a service alternative, the commission, at a minimum, shall consider the following:

(a) Whether the rate generates revenues at least sufficient to cover relevant short and long run costs of the utility during the term of the rates;

(b) Whether the rate generates revenues sufficient to insure that just and reasonable rates are established for remaining customers of the utility;

(c) For electric and natural gas utilities:

(A) Whether it is appropriate to incorporate interruption of service in the utility’s rate agreement with the customer; and

(B) Whether the rate agreement requires the utility to acquire new resources to serve the load; and

(d) For electric utilities, for service to load not previously served, the effect of the rate on the utility’s average system cost through the residential exchange provision of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, Public Law 96-501, as amended.

(2) The commission may prescribe such changes in the form in which the schedules are issued by any public utility as may be found to be expedient. The commission shall adopt rules which allow any person who requests notice of tariff filings described under subsection (1) of this section to receive such notice. [Amended by 1971 c.655 §72; 1977 c.682 §1; 1987 c.900 §1]

757.235 [Amended by 1953 c.285 §2; repealed by 1981 c.715 §3]

757.240 Filing schedules in places where utility consumers make payments. (1) A copy of so much of all schedules, including schedules of joint rates and charges, as the Public Utility Commission deems necessary for the use of the public shall be printed in plain type and kept on file in every business office of such public utility, open to the public, and in such form and place as to be readily accessible to the public for convenient inspection.

(2) Copies of all new schedules shall be filed in every business office of such public utility 30 days prior to the time the schedules are to take effect, unless the commission prescribes a shorter time. [Amended by 1971 c.655 §73]

757.245 Establishment of joint rates. (1) A public utility may establish reasonable through service and joint rates and classifications with other public utilities. Public utilities establishing joint rates shall establish just and reasonable regulations and practices in connection therewith and just, reasonable and equitable divisions thereof as between the public utilities participating therein, which shall not unduly prefer or prejudice any of such participating public utilities, and every unjust and unreasonable rate, classification, regulation, practice and division is prohibited.

(2) The Public Utility Commission may, and shall, whenever deemed by the commission to be necessary or desirable in the public interest, after full hearing upon complaint, or upon the commission’s own initiative without complaint, establish through service, classifications and joint rates, the divisions of such rates and the terms and conditions under which such through service shall be rendered. If any tariff or schedule canceling any through service or joint rate or classification without the consent of all the public utilities parties thereto or authorization by the commission is suspended by the commission for investigation, the burden of proof is upon the public utilities proposing such cancellation to show that it is consistent with the public interest.

(3) Whenever, after full hearing upon complaint or upon the commission’s own initiative without complaint, the commission is of the opinion that the divisions of joint rates between the public utilities are or will be unjust, unreasonable, inequitable or unduly preferential or prejudicial as between the public utilities parties thereto, whether agreed upon by such public utilities or otherwise established, the commission shall, by order, prescribe the just, reasonable and equitable divisions thereof to be received by the several public utilities. In cases where the joint rate was established pursuant to the finding or order of the commission and the divisions thereto are found by the commission to have been unjust, unreasonable or inequitable, or unduly preferential or prejudicial, the commission may also by order determine what, for the period subsequent to the filing of the complaint or petition or the making of the order of investigation, would have been the just, reasonable and equitable division thereof to be received by the several public utilities and require adjustment to be made in accordance therewith.

(4) In so prescribing and determining the divisions of joint rates, the commission shall give due consideration, among other things, to:

(a) The efficiency with which the public utilities concerned are operated;

(b) The amount of revenue to pay their respective operating expenses, taxes and a fair return on their public utility property held for and used in service;

(c) The importance to the public of the services of such public utilities;

(d) Whether any particular participating public utility is an originating, intermediate or delivering utility; and

(e) Any other fact or circumstance which ordinarily would entitle one public utility to a greater or less proportion of the joint rate than another. [Amended by 1971 c.655 §74]

757.247 Tariff schedules for energy conservation. The Public Utility Commission may authorize a public utility to file and place into effect tariff schedules establishing rates or charges for energy conservation measures, services or payments provided to individual property owners or customers. Application of the schedule shall be subject to agreement between the public utility and the property owner or customer receiving service at the time the conservation measures, services or payments are initially provided. The schedule may include provisions for the payment of the rates or charges over a period of time and for the application of the payment obligation to successive property owners or customers at the premises where the conservation measures or services were installed or performed or with respect to which the conservation payments were made. The public utility shall record a notice of the payment obligation in the records maintained by the county clerk under ORS 205.130. The commission may prescribe by rule under the applicable provisions of ORS 183.325 to 183.400 other methods by which the public utility shall notify property owners or customers of any such payment obligation. [1991 c.268 §2]

757.250 Standards and appliances for measuring service. (1) The Public Utility Commission shall ascertain and prescribe for each kind of public utility suitable and convenient standard commercial units of service. These shall be lawful units for the purposes of this chapter.

(2) The commission shall ascertain and fix adequate and serviceable standards for the measurement of quality, pressure, initial voltage or other conditions pertaining to the supply of the service rendered by any public utility and prescribe reasonable regulations for examination and testing of such service and for the measurement thereof. It shall establish reasonable rules, regulations, specifications and standards to secure the accuracy of all meters and appliances for the measurements, and every public utility is required to carry into effect all orders issued by the commission relative thereto. [Amended by 1971 c.655 §75]

757.255 Testing of measuring appliances. (1) The Public Utility Commission may provide for the examination and testing of any and all appliances used for the measuring of any service of a public utility, and may provide by rule that no such appliance shall be installed and used for the measuring of any service of any public utility until it has been examined and tested by the commission and found to be accurate.

(2) The commission shall declare and establish a reasonable fee governing the cost of such examination and test, which shall be paid to the commission by the public utility.

(3) The commission shall declare and establish reasonable fees for the testing of such appliances on the application of the customer, the fee to be paid by the customer at the time of the customer’s request, but to be repaid to the customer by the commission and to be paid by the public utility if the appliance is found defective or incorrect to the disadvantage of the customer or used beyond such reasonable limit as may be prescribed by the commission.

(4) All fees collected under the provisions of this section shall be paid by the commission into the State Treasury.

(5) The commission may purchase such materials, apparatus and standard measuring instruments for the examination and tests as the commission deems necessary. [Amended by 1971 c.655 §76]

757.259 Amounts includable in rate schedule; deferral; limit in effect on rates by amortization. (1) In addition to powers otherwise vested in the Public Utility Commission, and subject to the limitations contained in this section, under amortization schedules set by the commission, a rate or rate schedule may reflect the following:

(a) Amounts lawfully imposed retroactively by order of another governmental agency; or

(b) Amounts deferred under subsection (2) of this section.

(2) Upon application of a utility or ratepayer or upon the commission’s own motion and after public notice, opportunity for comment and a hearing if any party requests a hearing, the commission by order may authorize deferral of the following amounts for later incorporation in rates:

(a) Amounts incurred by a utility resulting from changes in the wholesale price of natural gas or electricity approved by the Federal Energy Regulatory Commission;

(b) Balances resulting from the administration of Section 5(c) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980;

(c) Direct or indirect costs arising from any purchase made by a public utility from the Bonneville Power Administration pursuant to ORS 757.663, provided that such costs shall be recovered only from residential and small-farm retail electricity consumers;

(d) Amounts accruing under a plan for the protection of short-term earnings under ORS 757.262 (2); or

(e) Identifiable utility expenses or revenues, the recovery or refund of which the commission finds should be deferred in order to minimize the frequency of rate changes or the fluctuation of rate levels or to match appropriately the costs borne by and benefits received by ratepayers.

(3) The commission may authorize deferrals under subsection (2) of this section beginning with the date of application, together with interest established by the commission. A deferral may be authorized for a period not to exceed 12 months beginning on or after the date of application. However, amounts deferred under subsection (2)(c) and (d) of this section are not subject to subsection (4), (5), (6) or (7) of this section, but are subject to such limitations and requirements that the commission may prescribe and that are consistent with the provisions of this section.

(4) Unless subject to an automatic adjustment clause under ORS 757.210 (1), amounts described in this section shall be allowed in rates only to the extent authorized by the commission in a proceeding under ORS 757.210 to change rates and upon review of the utility’s earnings at the time of application to amortize the deferral. The commission may require that amortization of deferred amounts be subject to refund. The commission’s final determination on the amount of deferrals allowable in the rates of the utility is subject to a finding by the commission that the amount was prudently incurred by the utility.

(5) Except as provided in subsections (6) and (7) of this section, the overall average rate impact of the amortizations authorized under this section in any one year may not exceed three percent of the utility’s gross revenues for the preceding calendar year.

(6) The commission may allow an overall average rate impact greater than that specified in subsection (5) of this section for natural gas commodity and pipeline transportation costs incurred by a natural gas utility if the commission finds that allowing a higher amortization rate is reasonable under the circumstances.

(7) The commission may authorize amortizations for an electric utility under this section with an overall average rate impact not to exceed six percent of the electric utility’s gross revenues for the preceding calendar year. If the commission allows an overall average rate impact greater than that specified in subsection (5) of this section, the commission shall estimate the electric utility’s cost of capital for the deferral period and may also consider estimated changes in the electric utility’s costs and revenues during the deferral period for the purpose of reviewing the earnings of the electric utility under the provisions of subsection (4) of this section.

(8) The provisions of subsection (7) of this section do not limit the ability of the commission to impose requirements similar to those described in subsection (7) of this section for the amortization of deferrals under this section that are not subject to subsection (7) of this section.

(9) The provisions of this section do not apply to a telecommunications utility. [1987 c.563 §2; 1989 c.18 §1; 1989 c.956 §1; 1993 c.175 §1; 1999 c.865 §31; 2001 c.733 §3]

757.260 [Amended by 1971 c.655 §18; renumbered 756.075]

757.262 Rates to encourage acquisition of cost-effective conservation resources. (1) The Public Utility Commission, by rule, may adopt policies designed to encourage the acquisition of cost-effective conservation resources and small-scale, renewable-fuel electric generating resources.

(2) In furtherance of the policies adopted pursuant to subsection (1) of this section, and in such manner as the commission considers proper, the commission may authorize periodic rate adjustments for the purpose of providing some protection to a utility from reduction of short-term earnings that may result from implementation of such policies. The adjustments may include, but are not limited to, adjustments based in whole or in part upon the extent to which actual sales deviate from a base level of sales the commission considers appropriate. [1993 c.175 §3; 1999 c.944 §3]

757.265 [Repealed by 1971 c.655 §250]

757.266 Rates may encourage tree planting programs as offset to carbon dioxide emissions. The Public Utility Commission of Oregon may allow a rate or rate schedule of a public utility to reflect amounts for small scale programs that enable the utility to gain experience with tree planting on underproducing forestland, as defined by the State Forestry Department, as an offset to carbon dioxide emissions. [1993 c.286 §1]

Note: 757.266 was enacted into law by the Legislative Assembly but was not added to or made a part of ORS chapter 757 or any series therein by legislative action. See Preface to Oregon Revised Statutes for further explanation.

ATTACHMENTS REGULATION

757.270 Definitions for ORS 757.270 to 757.290. As used in ORS 757.270 to 757.290, unless the context requires otherwise:

(1) "Attachment" means any wire or cable for the transmission of intelligence by telegraph, telephone or television (including cable television), light waves, or other phenomena, or for the transmission of electricity for light, heat or power, and any related device, apparatus, or auxiliary equipment, installed upon any pole or in any telegraph, telephone, electrical, cable television or communications right of way, duct, conduit, manhole or handhole or other similar facility or facilities owned or controlled, in whole or in part, by one or more public utility, telecommunications utility or consumer-owned utility.

(2) "Consumer-owned utility" means a people’s utility district organized under ORS chapter 261, a municipal utility organized under ORS chapter 225 or an electric cooperative organized under ORS chapter 62.

(3) "Licensee" means any person, firm, corporation, partnership, company, association, joint stock association or cooperatively organized association that is authorized to construct attachments upon, along, under or across the public ways.

(4) "Public utility" has the meaning for that term provided in ORS 757.005, and does not include any entity cooperatively organized or owned by federal, state or local government, or a subdivision of state or local government.

(5) "Telecommunications utility" has the meaning for that term provided in ORS 759.005, and does not include any entity cooperatively organized or owned by federal, state or local government or a subdivision of state or local government. [1979 c.356 §2; 1989 c.5 §4; 1999 c.832 §4]

757.271 Authorization from pole owner required for attachment. (1) Subject to applicable regulations of the Public Utility Commission, a person shall not establish an attachment to a pole or other facility of a public utility, telecommunications utility or consumer-owned utility unless the person has executed a contract with and has authorization from the utility allowing the attachment.

(2) A licensee shall report all pole attachments to the pole owner. A pole owner may impose on a licensee a penalty charge for failing to report an attachment. The pole owner also may charge the licensee for any expenses incurred as a result of an unauthorized attachment or any attachment that exceeds safety limits established by rule of the commission. [1999 c.832 §2]

757.272 Pole owner may approve or reject attachment. (1) A licensee shall notify a public utility, telecommunications utility or consumer-owned utility of all attachments to the utility’s poles according to the terms of any agreement between the licensee and the utility.

(2) Notwithstanding subsection (1) of this section, the public utility, telecommunications utility or consumer-owned utility may approve or reject the attachment. If the attachment is rejected, the licensee shall remove the attachment within three business days of the date the attachment is rejected. If the attachment is not removed within three business days of the date the attachment is rejected, the utility may remove the attachment and charge the licensee for all costs incurred by the utility in removing the attachment. [1999 c.832 §3]

757.273 Attachments to public utility and telecommunications utility facilities regulated. The Public Utility Commission of Oregon shall have the authority to regulate in the public interest the rates, terms and conditions for attachments by licensees to poles or other facilities of public utilities and telecommunications utilities. All rates, terms and conditions made, demanded or received by any public utility or telecommunications utility for any attachment by a licensee shall be just, fair and reasonable. [1979 c.356 §3; 1989 c.5 §5]

757.276 Attachments by licensees to consumer-owned utility facilities regulated. The Public Utility Commission of Oregon shall have the authority to regulate the rates, terms and conditions for attachments by licensees to poles or other facilities of consumer-owned utilities. All rates, terms and conditions made, demanded or received by any consumer-owned utility for any attachment by a licensee shall be just, fair and reasonable. [1979 c.356 §4; 1987 c.414 §164; 1999 c.832 §5]

757.279 Fixing rates or charges by commission; cost of hearing. (1) Whenever the Public Utility Commission of Oregon finds, after hearing had upon complaint by a licensee, a public utility, a telecommunications utility or a consumer-owned utility that the rates, terms or conditions demanded, exacted, charged or collected in connection with attachments or availability of surplus space for such attachments are unjust or unreasonable, or that such rates or charges are insufficient to yield a reasonable compensation for the attachment and the costs of administering the same, the commission shall determine the just and reasonable rates, terms and conditions thereafter to be observed and in force and shall fix the same by order. In determining and fixing such rates, terms and conditions, the commission shall consider the interest of the customers of the licensee, as well as the interest of the customers of the public utility, telecommunications utility or consumer-owned utility that owns the facility upon which the attachment is made.

(2) When the order applies to a consumer-owned utility, the order shall also provide for payment by the parties of the cost of the hearing. The payment shall be made in a manner which the commission considers equitable. [1979 c.356 §5; 1983 c.251 §1; 1987 c.414 §165; 1989 c.5 §6; 1999 c.832 §6]

757.282 Criteria for just and reasonable rate for attachments; rate reduction. (1) A just and reasonable rate shall ensure the public utility, telecommunications utility or consumer-owned utility the recovery from the licensee of not less than all the additional costs of providing and maintaining pole attachment space for the licensee nor more than the actual capital and operating expenses, including just compensation, of the public utility, telecommunications utility or consumer-owned utility attributable to that portion of the pole, duct or conduit used for the pole attachment, including a share of the required support and clearance space in proportion to the space used for pole attachment above minimum attachment grade level, as compared to all other uses made of the subject facilities, and uses that remain available to the owner or owners of the subject facilities.

(2) A licensee shall receive a rental deduction if the licensee is in compliance with rules adopted by the Public Utility Commission for certifying compliance with the laws regulating pole attachments. A licensee is eligible for the rental reduction unless the commission or the utility authorizing the attachment notifies the licensee in writing that the licensee has failed to comply with either the commission’s rules or the terms of a contract between the licensee and the utility authorizing the attachment.

(3) For purposes of determining the rental rate for a pole attachment, the usable space on the pole shall include 20 inches of safety clearance space between communication circuits and electric circuits, provided the licensee is in compliance with rules and agreements as described in subsection (2) of this section. [1979 c.356 §6; 1989 c.5 §7; 1999 c.832 §7]

757.285 Presumption of reasonableness of rates set by private agreement. Agreements regarding rates, terms and conditions of attachments shall be deemed to be just, fair and reasonable, unless the Public Utility Commission finds upon complaint by a public utility, telecommunications utility, consumer-owned utility or licensee party to such agreement and after hearing, that such rates, terms and conditions are adverse to the public interest and fail to comply with the provisions hereof. [1979 c.356 §7; 1987 c.414 §166; 1989 c.5 §8; 1999 c.832 §8]

757.287 Application to electrical utility attachments. Nothing in ORS 757.270 to 757.290 shall be deemed to apply to any attachment by one or more electrical utilities on the facilities of one or more other electrical utilities. [1979 c.356 §8]

757.290 Regulatory procedures. The procedures of the Public Utility Commission for petition, regulation and enforcement relative to attachments, including any rights of appeal from any decision thereof, shall be the same as those otherwise generally applicable to the commission. [1979 c.356 §9; 1987 c.414 §167]

Note: Section 9, chapter 832, Oregon Laws 1999, provides:

Sec. 9. (1) The Public Utility Commission shall establish a task force consisting of utility pole owners and utility pole users to advise the commission on policies and regulations for accommodating changes in the utility industries while maintaining safe and efficient utility poles, attachment installation practices and rights of way.

(2) In addition to the duties described in subsection (1) of this section, the task force shall:

(a) Develop and submit to the commission proposed rules for determining appropriate sanctions for unauthorized attachments; and

(b) Develop and submit to the commission proposed criteria for certifying compliance with laws regulating pole attachments.

(3) The commission shall adopt rules for certifying a licensee’s compliance with laws regulating pole attachments and establishing appropriate sanctions for unauthorized pole attachments. [1999 c.832 §9]

NET METERING FACILITIES

757.300 Net metering facility allowed to connect to public utility; conditions for connecting and measuring energy; application to out-of-state utilities. (1) As used in this section:

(a) "Customer-generator" means a user of a net metering facility.

(b) "Electric utility" means a public utility, a people’s utility district operating under ORS chapter 261, a municipal utility operating under ORS chapter 225 or an electric cooperative organized under ORS chapter 62.

(c) "Net metering" means measuring the difference between the electricity supplied by an electric utility and the electricity generated by a customer-generator and fed back to the electric utility over the applicable billing period.

(d) "Net metering facility" means a facility for the production of electrical energy that:

(A) Uses solar, wind, fuel cell or hydroelectric power to generate electricity;

(B) Has a generating capacity of not more than 25 kilowatts;

(C) Is located on the customer-generator’s premises;

(D) Can operate in parallel with an electric utility’s existing transmission and distribution facilities; and

(E) Is intended primarily to offset part or all of the customer-generator’s requirements for electricity.

(2) An electric utility that offers residential and commercial electric service:

(a) Shall allow net metering facilities to be interconnected using a standard meter that is capable of registering the flow of electricity in two directions.

(b) May at its own expense install one or more additional meters to monitor the flow of electricity in each direction.

(c) May not charge a customer-generator a fee or charge that would increase the customer-generator’s minimum monthly charge to an amount greater than that of other customers in the same rate class as the customer-generator. However, the Public Utility Commission, for a public utility, or the governing body, for a municipal electric utility, electric cooperative or people’s utility district, may authorize an electric utility to assess a greater fee or charge, of any type, if the electric utility’s direct costs of interconnection and administration of the net metering outweigh the distribution system, environmental and public policy benefits of allocating such costs among the electric utility’s entire customer base. The commission may authorize a public utility to assess a greater fee or charge under this paragraph only following notice and opportunity for public comment. The governing body of a municipal electric utility, electric cooperative or people’s utility district may assess a greater fee or charge under this paragraph only following notice and opportunity for comment from the customers of the utility, cooperative or district.

(3)(a) For a customer-generator, an electric utility shall measure the net electricity produced or consumed during the billing period in accordance with normal metering practices.

(b) If an electric utility supplies a customer-generator more electricity than the customer-generator feeds back to the electric utility during a billing period, the electric utility shall charge the customer-generator for the net electricity that the electric utility supplied.

(c) Except as provided in paragraph (d) of this subsection, if a customer-generator feeds back to an electric utility more electricity than the electric utility supplies the customer-generator during a billing period, the electric utility may charge the minimum monthly charge described in subsection (2) of this section but must credit the customer-generator for the excess kilowatt-hours generated during the billing period. An electric utility may value the excess kilowatt-hours at the avoided cost of the utility, as determined by the commission or the appropriate governing body. An electric utility that values the excess kilowatt-hours at the avoided cost shall bear the cost of measuring the excess kilowatt-hours, issuing payments and billing for the excess hours. The electric utility also shall bear the cost of providing and installing additional metering to measure the reverse flow of electricity.

(d) For the billing cycle ending in March of each year, or on such other date as agreed to by the electric utility and the customer-generator, any remaining unused kilowatt-hour credit accumulated during the previous year shall be granted to the electric utility for distribution to customers enrolled in the electric utility’s low-income assistance programs, credited to the customer-generator or dedicated for other use as determined by the commission, for a public utility, or the governing body, for a municipal electric utility, electric cooperative or people’s utility district, following notice and opportunity for public comment.

(4)(a) A net metering facility shall meet all applicable safety and performance standards established in the state building code. The standards shall be consistent with the applicable standards established by the National Electrical Code, the Institute of Electrical and Electronics Engineers and Underwriters Laboratories or other similarly accredited laboratory.

(b) Following notice and opportunity for public comment, the commission, for a public utility, or the governing body, for a municipal electric utility, electric cooperative or people’s utility district, may adopt additional control and testing requirements for customer-generators to protect public safety or system reliability.

(c) An electric utility may not require a customer-generator whose net metering facility meets the standards in paragraphs (a) and (b) of this subsection to comply with additional safety or performance standards, perform or pay for additional tests or purchase additional liability insurance. However, an electric utility shall not be liable directly or indirectly for permitting or continuing to allow an attachment of a net metering facility, or for the acts or omissions of the customer-generator that cause loss or injury, including death, to any third party.

(5) Nothing in this section is intended to prevent an electric utility from offering, or a customer-generator from accepting, products or services related to the customer-generator’s net metering facility that are different from the net metering services described in this section.

(6) The commission, for a public utility, or the governing body, for a municipal electric utility, electric cooperative or people’s utility district, may not limit the cumulative generating capacity of solar, wind, fuel cell and microhydroelectric net metering systems to less than one-half of one percent of a utility’s, cooperative’s or district’s historic single-hour peak load. After a cumulative limit of one-half of one percent has been reached, the obligation of a public utility, municipal electric utility, electric cooperative or people’s utility district to offer net metering to a new customer-generator may be limited by the commission or governing body in order to balance the interests of retail customers. When limiting net metering obligations under this subsection, the commission or the governing body shall consider the environmental and other public policy benefits of net metering systems. The commission may limit net metering obligations under this subsection only following notice and opportunity for public comment. The governing body of a municipal electric utility, electric cooperative or people’s utility district may limit net metering obligations under this subsection only following notice and opportunity for comment from the customers of the utility, cooperative or district.

(7) The commission or the governing body may adopt rules or ordinances to ensure that the obligations and costs associated with net metering apply to all power suppliers within the service territory of a public utility, municipal electric utility, electric cooperative or people’s utility district.

(8) Notwithstanding subsections (2) to (7) of this section, an electric utility serving fewer than 25,000 customers in Oregon that has its headquarters located in another state and offers net metering services or a substantial equivalent offset against retail sales in that state shall be deemed to be in compliance with this section if the electric utility offers net metering services to its customers in Oregon in accordance with tariffs, schedules and other regulations promulgated by the appropriate authority in the state where the electric utility’s headquarters are located. [1999 c.944 §2]

757.305 [Amended by 1971 c.655 §77; repealed by 1979 c.190 §431]

ILLEGAL PRACTICES

757.310 Unjust discrimination in charges for service. (1) Except as provided in ORS 757.315, no public utility or any agent or officer thereof shall, directly or indirectly, by any device, charge, demand, collect or receive from any person a greater or less compensation for any service rendered or to be rendered by it than:

(a) That prescribed in the public schedules or tariffs then in force or established; or

(b) It charges, demands, collects or receives from any other person for a like and contemporaneous service under substantially similar circumstances. A difference in rates or charges based upon a difference in classification pursuant to ORS 757.230 shall not constitute a violation of this paragraph. A difference in rates or charges for a service provided pursuant to ORS 757.516 shall not constitute a violation of this paragraph.

(2) Any public utility violating this section is guilty of unjust discrimination. [Amended by 1971 c.655 §78; 1987 c.900 §2; 1993 c.485 §3]

757.315 Transactions not constituting unjust discrimination. (1) ORS 757.310 does not prevent any public utility from giving free service, or reduced rates therefor, to:

(a) Its officers, directors, employees and members of their families;

(b) Former employees of such public utilities or members of their families where such former employees have become disabled in the service of such public utility or are unable from physical disqualification, including retirement, to continue in the service; or

(c) Members of families of deceased employees of such public utility.

(2) The Public Utility Commission may require any public utility to file with the commission a list, verified under oath, of all free or reduced rate privileges granted by a public utility under the provisions of this section.

(3) The Public Utility Commission may authorize a natural gas public utility, upon application of the utility, to include in rates for residential customers of the utility amounts for the purpose of generating funds to be used for bill payment assistance to low-income residential customers of the utility. [Amended by 1971 c.655 §79; 2001 c.856 §1]

757.320 Reducing rates for persons furnishing part of necessary facilities. (1) No public utility shall demand, charge, collect or receive from any person less compensation for any service rendered or to be rendered by the public utility in consideration of the furnishing by such person of any part of the facilities incident thereto.

(2) This section does not prohibit any public utility from renting any customer’s facilities incident to providing its services and for paying a reasonable rental therefor.

(3) This section does not require a public utility to furnish any part of such appliances which are situated in and upon the premises of any customer, except meters and appliances for measurements of any service, unless otherwise ordered by the Public Utility Commission. [Amended by 1971 c.655 §80]

757.325 Undue preferences and prejudices. (1) No public utility shall make or give undue or unreasonable preference or advantage to any particular person or locality, or shall subject any particular person or locality to any undue or unreasonable prejudice or disadvantage in any respect.

(2) Any public utility violating this section is guilty of unjust discrimination.

757.330 Soliciting or accepting special privileges from utilities. No person shall knowingly solicit, accept or receive any rebate, concession or discrimination in respect to any service whereby any such service shall, by any device, be rendered free or at a lesser rate than that named in the published schedules and tariffs in force, or whereby any service or advantage is received other than authorized in this chapter. [Amended by 1971 c.655 §81]

757.335 [Amended by 1971 c.655 §25; renumbered 756.185]

757.340 [Amended by 1971 c.655 §22; renumbered 756.125]

757.345 [Repealed by 1971 c.655 §250]

757.350 [Repealed by 1971 c.655 §250]

757.355 Costs of property not presently providing utility service excluded from rate base. No public utility shall, directly or indirectly, by any device, charge, demand, collect or receive from any customer rates which are derived from a rate base which includes within it any construction, building, installation or real or personal property not presently used for providing utility service to the customer. [1979 c.3 §2]

ISSUANCE OF SECURITIES

757.400 Definition of "stocks." As used in ORS 757.400 to 757.460, "stocks" means stocks, stock certificates or other evidence of interest or ownership.

757.405 Power to regulate issuance of utility securities. The power of public utilities to issue stocks and bonds, notes and other evidences of indebtedness and to create liens on their property situated within this state is a special privilege, the right of supervision, regulation, restriction and control of which is and shall continue to be vested in the state. Such power shall be exercised as provided by law and under such rules and regulations as the Public Utility Commission may prescribe.

757.410 When issuance of securities is void. All stocks and bonds, notes or other evidences of indebtedness, and any security of a public utility shall be void when issued:

(1) Without an order of the Public Utility Commission authorizing the same then in effect except as provided in ORS 757.412 or 757.415 (3).

(2) With the authorization of the commission, but not conforming in its provisions to the provisions, if any, which it is required by the order of authorization of the commission to contain; but no failure to comply with the terms or conditions of the order of authorization of the commission and no informality or defect in the application or in the proceedings in connection therewith or with the issuance of such order shall render void any stock or bond, note or other evidence of indebtedness, or security issued pursuant to and in substantial conformity with an order of the commission, except as to a person taking the same otherwise than in good faith and for value and without actual notice. [Amended by 1997 c.261 §1]

757.412 Exemption from securities regulation. Subject to such terms and conditions as the Public Utility Commission may prescribe, the commission, by rule or order, may exempt the following from any or all of the provisions of ORS 757.400 to 757.480, if the commission finds that application of the law is not required by the public interest:

(1) Any stocks and bonds, notes or other evidences of indebtedness and any other security or guarantee or class of securities or guarantees for which commission authorization would otherwise be required prior to the issuance, incurrence or assumption thereof.

(2) Any public utility or class of public utilities. [1997 c.261 §3]

Note: 757.412 was added to and made a part of ORS chapter 757 by legislative action but was not added to any smaller series therein. See Preface to Oregon Revised Statutes for further explanation.

757.415 Purposes for which securities and notes may be issued; order required. (1) A public utility may issue stocks and bonds, notes and other evidences of indebtedness, certificates of beneficial interests in a trust and securities for the following purposes and no others, except as otherwise permitted by subsection (4) of this section:

(a) The acquisition of property, or the construction, completion, extension or improvement of its facilities.

(b) The improvement or maintenance of its service.

(c) The discharge or lawful refunding of its obligations.

(d) The reimbursement of money actually expended from income or from any other money in the treasury of the public utility not secured by or obtained from the issue of stocks or bonds, notes or other evidences of indebtedness, or securities of such public utility, for any of the purposes listed in paragraphs (a) to (c) of this subsection except the maintenance of service and replacements, in cases where the applicant has kept its accounts and vouchers for such expenditures in such manner as to enable the Public Utility Commission of Oregon to ascertain the amount of money so expended and the purposes for which such expenditures were made.

(e) The compliance with terms and conditions of options granted to its employees to purchase its stock, if the commission first finds that such terms and conditions are reasonable and in the public interest.

(f) The finance or refinance of bondable conservation investment as described in ORS 757.455. Bonds, notes, certificates of beneficial interests in a trust and other evidences of indebtedness or ownership, issued for this purpose are "conservation bonds" for the purposes of ORS 757.460. Conservation bonds may rely partly or wholly for repayment on conservation investment assets and revenues arising with respect to conservation investment assets.

(2) Before issuing such securities a public utility, in addition to the other requirements of law, shall secure from the commission upon application an order authorizing such issue, stating:

(a) The amount of the issue and the purposes to which the issue or the proceeds thereof are to be applied; and

(b) In the opinion of the commission, the money, property or labor to be procured or paid for by such issue reasonably is required for the purposes specified in the order and compatible with the public interest, which is necessary or appropriate for or consistent with the proper performance by the applicant of service as a public utility, and will not impair its ability to perform that service; and

(c) Except as otherwise permitted in the order in the case of bonds, notes or other evidences of indebtedness, such purposes are not, in whole or in part, reasonably chargeable to operating expenses or to income.

(3) This section and ORS 757.410 apply to demand notes but do not apply to the issuance or renewal of a note or evidence of indebtedness maturing not more than one year after date of such issue or renewal.

(4) Nothing in ORS 757.400 to 757.460 shall prevent issuance of stock to stockholders as a stock dividend if there has been secured from the commission an order:

(a) Finding that the stock dividend is compatible with the public interest;

(b) Authorizing such issue and a transfer of surplus to capital in an amount equal to the par or stated value of the stock so authorized; and

(c) Finding that a sum equal to the amount to be so transferred was expended for the purposes enumerated in subsection (1) of this section.

(5) Conservation bonds authorized pursuant to subsection (1) of this section may be issued directly by a public utility or through a finance subsidiary. A "finance subsidiary" means any corporation, limited liability company, company, association, trust or other entity that is:

(a) Beneficially owned, directly or indirectly, by a public utility or, in the case of a trust, for which a public utility or subsidiary thereof is the grantor; or

(b) Unaffiliated with a public utility and acquires bondable conservation investment directly or indirectly from a public utility in a transaction approved by the commission. [Amended by 1961 c.319 §1; 1995 c.539 §4]

757.417 Limitation on application of ORS 757.415. ORS 757.415 does not apply to the issuance, renewal or assumption of liability on any evidence of indebtedness when such issuance, renewal or assumption is for the purpose of acquiring specific real or personal property, if the aggregate principal amount thereof, together with all other then outstanding evidences of indebtedness issued, renewed or assumed under this section, does not exceed whichever is the greater of the following amounts:

(1) The amount of $75,000.

(2) The amount of one-half of one percent of the sum of:

(a) The total principal amount of all bonds or other securities representing secured indebtedness of the public utility issued or assumed and then outstanding; and

(b) The capital and surplus as then stated on the books of account of the public utility. [1971 c.655 §88]

757.419 Limitation on application of ORS 757.480. ORS 757.480 does not apply to any mortgage or other encumbrance upon any real or personal property given to secure payment of any evidence of indebtedness issued under ORS 757.415. [1971 c.655 §89]

757.420 Hearings and supplemental orders relating to issuance of securities; joint approval of issuance by interstate utility. (1) To enable the Public Utility Commission to determine whether the commission will issue an order under ORS 757.415, the commission may hold a hearing and may make such additional inquiry or investigation, examine such witnesses, books, papers, documents and contracts and require the filing of such data as the commission deems necessary. The application for such order shall be given priority and shall be disposed of by the commission within 30 days after the filing of such application, unless that period is extended with the consent of the public utility.

(2) The commission may, upon application of the public utility, after opportunity for hearing and for good cause shown, make such supplemental orders in the premises as the commission finds necessary or appropriate, and may by any such supplemental order modify the provisions of any previous order as to the particular purposes, uses, extent to which, or the condition under which, any security theretofore authorized or its proceeds may be applied. Such supplemental orders are subject to the requirements of ORS 757.415. The period of time permitted under subsection (1) of this section for disposing of applications shall not apply to supplemental orders.

(3) If a commission or other agency is empowered by another state to regulate and control the amount and character of securities to be issued by any public utility within such other state, the commission of Oregon has power to agree with such commission or agency of such other state on the issue of stocks, bonds, notes, other evidences of indebtedness or securities by a public utility owning or operating a public utility both in such state and in this state, and has power to approve such issue jointly with such commission or agency and to issue a joint certificate of such approval. However, no such joint approval is required in order to express the consent to and approval of such issue by the State of Oregon if the issue is separately approved by the Oregon commission.

757.425 State not obligated following approval of issuance. No provision of ORS 757.405 to 757.450, and no deed or act done or performed under or in connection therewith, shall be held or construed to obligate the State of Oregon to pay or guarantee, in any manner whatsoever, any stock or bond, note or other evidence of indebtedness, authorized, issued or executed under the provisions of ORS 757.405 to 757.450.

757.430 Conditional approval of issuance authorized. The Public Utility Commission may by order grant permission for the issue of stocks or bonds, notes or other evidences of indebtedness in the amount applied for, or in a lesser amount, or not at all, and may attach to the exercise of the permission such condition or conditions as the commission deems reasonable and necessary.

757.435 Disposal of proceeds from issuance of securities. (1) No public utility shall, without the consent of the Public Utility Commission, apply the issue of any stock or bond, note or other evidence of indebtedness, or any part or proceeds thereof, to any purpose not specified in the commission’s order, or to any purpose specified in the commission’s order in excess of the amount authorized for such purpose, or issue or dispose of the same on any terms less favorable than those specified in such order, or a modification thereof.

(2) The commission has power to require public utilities to account for the disposition of the proceeds of all sales of stocks and bonds, notes and other evidences of indebtedness, in such form and detail as the commission deems advisable, and to establish such rules and regulations as the commission deems reasonable and necessary to insure the disposition of such proceeds for the purpose or purposes specified in the order.

757.440 Approval required before utility may guarantee another’s indebtedness. No public utility shall assume any obligation or liability as guarantor, indorser, surety or otherwise in respect to the securities of any other person, firm or corporation, when such securities are payable at periods of more than 12 months after the date thereof, without first having secured from the Public Utility Commission an order authorizing it so to do. Every assumption made other than in accordance with such an order is void.

757.445 Wrongful issues or use of proceeds by utility. No public utility shall directly or indirectly, issue or cause to be issued any stock or bond, note or other evidence of indebtedness, in nonconformity with the order of the Public Utility Commission authorizing the same or contrary to the provisions of ORS 757.400 to 757.460, or of the Constitution of this state, or apply the proceeds from the sale thereof, or any part thereof, to any purpose other than the purposes specified in the commission’s order, or to any purpose specified in the commission’s order in excess of the amount in the order authorized for such purpose.

757.450 Wrongful acts relating to issuance of securities. No person shall:

(1) Knowingly authorize, direct, aid in, issue or execute, or cause to be issued or executed, any stock or bond, note or other evidence of indebtedness, in nonconformity with the order of the Public Utility Commission authorizing the same, or contrary to the provisions of ORS 757.400 to 757.460 or of the Constitution of this state.

(2) In any proceeding before the commission, knowingly make any false statement or representation or with knowledge of its falsity file or cause to be filed with the commission any false statement or representation which may tend in any way to influence the commission to make an order authorizing the issue of any stock or bond, note or other evidence of indebtedness, or which results in procuring from the commission the making of any such order.

(3) With knowledge that any false statement or representation was made to the commission in any proceeding tending in any way to influence the commission to make such order, issue, execute or negotiate, or cause to be issued, executed or negotiated, any stock or bond, note or other evidence of indebtedness.

(4) Directly or indirectly, knowingly apply, or cause or assist to be applied, the proceeds, or any part thereof, from the sale of any stock or bond, note or other evidence of indebtedness, to any purpose not specified in the commission’s order, or to any purpose specified in the commission’s order in excess of the amount authorized for such purpose.

(5) With knowledge that any stock or bond, note or other evidence of indebtedness, has been issued or executed in violation of ORS 757.400 to 757.460, negotiate, or cause the same to be negotiated.

757.455 Conservation program investment policy; application for bondable investments; utility rates to include investment costs. (1) It is the policy of the Public Utility Commission of Oregon to encourage financing investments at the lowest possible cost to utility customers, including but not limited to conservation program expenditures.

(2) If the commission decides that a public utility should defer and amortize certain conservation program expenditures, the public utility may apply to the commission for an order designating all or part of the conservation program expenditures as bondable conservation investment, for the purpose of financing or refinancing the designated expenditures under ORS 757.415 (1)(f). After notice and an opportunity for a hearing, the commission may approve the application if it finds that the conservation program expenditures included in the application are used, useful and prudent and that financing or refinancing is likely to be more favorable to customers than other reasonably available alternatives. Upon approval, the commission shall issue an order stating the amount of the conservation program expenditures that qualify as bondable conservation investment.

(3) The commission shall set rates to include in revenue requirement recovery of a public utility’s bondable conservation investment, as well as the costs of equity and debt capital associated with it, including, without limitation, the payment of principal, premium, if any, and interest on conservation bonds. Revenues collectable or collected under this subsection shall be known as "conservation investment assets." The commission shall not revalue bondable conservation investment for rate-making purposes, determine that revenues required to recover bondable conservation investment and associated equity and debt capital costs are unjust or unreasonable, impair or reduce in any way the value of conservation investment assets, or impair the timing or the amount of revenues arising with respect to conservation investment assets that have been used to secure financing or refinancing under ORS 757.415 (1)(f).

(4) Subsections (2) and (3) of this section shall apply to any amounts presently deferred by a utility regardless of whether expended prior to September 9, 1995.

(5) As used in this section, "conservation program expenditures" includes, without limitation, loans and cash payments made to customers, the costs of conservation measures installed at the expense of the public utility, specific acquisition program development, promotion and labor costs and associated general supervision, rents, leases and overheads. [1995 c.539 §3]

757.460 Pledge of conservation investment assets as bond collateral; perfection of security interest; foreclosure. (1) A public utility or finance subsidiary may pledge conservation investment assets as collateral for conservation bonds by providing for a security interest in the conservation investment assets. A security interest in conservation investment assets is created and perfected only upon entry of an order by the Public Utility Commission of Oregon approving a contract governing the granting of the security interest, and the filing with the Secretary of State of a Uniform Commercial Code Article I financing statement showing such pledger as "debtor" and identifying the conservation investment assets and the bondable conservation investment pledged as security. The security interest is enforceable against the debtor and all third parties, subject to the rights of any third parties holding security interests in the conservation investment assets perfected in the manner described in this section if value has been given by the purchasers of the conservation bonds. An approved security interest in conservation investments assets is a continuously perfected security interest in all revenues and proceeds arising with respect to the associated bondable conservation investment, whether or not those revenues have accrued. Upon approval by the commission, the priority of the security interest shall be as set forth in the contract governing the conservation bonds. Conservation investment assets constitute property for the purposes of contracts securing the conservation bonds, whether or not the related revenues have accrued.

(2) The relative priority of a security interest created under this section is not defeated or adversely affected by the commingling of revenues arising with respect to conservation investment assets with other funds of the debtor. The holders of conservation bonds shall have a perfected security interest in all cash and deposit accounts of the debtor in which revenues arising with respect to conservation investment assets pledged to the holders of conservation bonds have been commingled with other funds, but the perfected security interest is limited to an amount not greater than the amount of the revenues received by the debtor within 12 months before any default under the conservation bonds held by the holders or the institution of insolvency proceedings by or against the debtor, less payments made from the revenues to the holders during that 12-month period. If a default occurs under an approved contract governing conservation bonds, the holders of the conservation bonds or their authorized representatives, as secured parties, may foreclose or otherwise enforce the perfected security interest in the conservation investment assets securing the conservation bonds, subject to the rights of any third parties holding prior security interests in the conservation investment assets perfected in the manner provided in this section. Upon application by the holders of the conservation bonds or their representatives, without limiting other remedies of those holders or representatives, the commission shall order the sequestration and payment to the holders or their representatives of revenues arising with respect to the debtor.

(3) The granting, perfection and enforcement of security interests in conservation investment assets to secure conservation bonds is governed by this section and not by ORS chapter 79.

(4) A transfer of conservation investment assets by a public utility to a finance subsidiary that the parties have expressly stated in the governing documentation to be a sale or other absolute transfer, in a transaction approved in an order issued by the commission and made in connection with the issuance by the finance subsidiary of conservation bonds, shall be treated as a true sale and not as a pledge or other financing of the conservation investment assets. According the holders of conservation bonds a preferred right to revenues of the public utility or the provision by the utility of other credit enhancement with respect to conservation bonds does not impair or negate the characterization of any transfer as a true sale.

(5) Any successor to a public utility pursuant to any bankruptcy, reorganization or other insolvency proceeding shall perform and satisfy all obligations of the utility under an approved contract governing conservation bonds in the same manner and to the same extent as was required of the utility before the proceeding, including, without limitation, collecting and paying to the holders of the conservation bonds or their representatives revenues arising with respect to the conservation investment assets pledged to secure the conservation bonds.

(6) As used in this section:

(a) "Conservation investment assets" has the meaning given under ORS 757.455.

(b) "Finance subsidiary" has the meaning given under ORS 757.415. [1995 c.539 §2]

TRANSACTIONS INVOLVING UTILITIES

757.480 Approval needed prior to disposal, mortgage or encumbrance of certain operative utility property or consolidation with another public utility; exceptions. (1) A public utility doing business in Oregon shall not, without first obtaining the Public Utility Commission’s approval of such transaction:

(a) Except as provided in subsection (5) of this section, sell, lease, assign or otherwise dispose of the whole of the property of such public utility necessary or useful in the performance of its duties to the public or any part thereof of a value in excess of $100,000, or sell, lease, assign or otherwise dispose of any franchise, permit or right to maintain and operate such public utility or public utility property, or perform any service as a public utility;

(b) Mortgage or otherwise encumber the whole or any part of the property of such public utility necessary or useful in the performance of its duties to the public, including any franchise, permit or right to maintain and operate such public utility or public utility property, or perform any service as a public utility; or

(c) By any means whatsoever, directly or indirectly, merge or consolidate any of its lines, plant, system or other property whatsoever, or franchise or permit to maintain or operate any public utility property, or perform any service as a public utility, or any part thereof, with any other public utility.

(2) A public utility that sells, leases, assigns or otherwise disposes of the whole of the property of such public utility necessary or useful in the performance of its duties to the public or any part thereof of a value in excess of $25,000, but less than $100,000, shall notify the commission of the sale within 60 days following the date of the sale.

(3) Every sale, lease, assignment, mortgage, disposition, encumbrance, merger or consolidation subject to subsection (1) of this section made other than in accordance with the order of the commission authorizing the same is void.

(4) This section does not prohibit or invalidate the sale, lease or other disposition by any public utility of property which is not necessary or useful in the performance of its duties to the public.

(5) A water utility doing business in Oregon shall not, without first obtaining the Public Utility Commission’s approval of such transaction, sell, lease, assign or otherwise dispose of the whole of the property of such water utility necessary or useful in the performance of its duties to the public or any part thereof of a value in excess of $10,000, or sell, lease, assign or otherwise dispose of any franchise, permit or right to maintain and operate such water utility or water utility property, or perform any service as a water utility. [Formerly 757.155; 1999 c.530 §1]

757.485 Purchase of property or stocks of one utility by another. (1) No public utility shall, directly or indirectly, purchase, acquire or become the owner of any of the stocks or bonds or property utilized for utility purposes and having a value in excess of $10,000 of any other public utility unless authorized so to do by the Public Utility Commission.

(2) Every contract by any public utility for the purchase, acquisition, assignment or transfer to it of any of the stock of any other public utility by or through any person, partnership or corporation without the approval of the commission shall be void and of no effect, and no such transfer or assignment of such stock upon the books of the corporation pursuant to any such contract is effective for any purpose. [Formerly 757.160]

757.490 Approval needed for certain contracts. (1) When any public utility doing business in this state enters into a contract with another corporation with relation to the construction, operation, maintenance or use of the property of said public utility in Oregon, or the use of the property of the other contracting party, or any part thereof, or for service, advice, engineering, financing, rentals, leasing or for any construction or management charges in respect of any such property, or for the purchase of property, materials or supplies, the proposed contract shall be filed with the Public Utility Commission for the investigation and approval when the public utility owns a majority of or controls directly or indirectly the voting stock of the other contracting corporations.

(2) Any such proposed contract shall be filed with the commission within 90 days of execution of the contract. The contract shall be deemed to be executed on the date the parties sign a written contract or on the date the parties begin to transact business under the contract, whichever date is earlier. The commission shall promptly investigate and act upon the contract in accordance with ORS 757.495 (3) and (6).

(3) In making such investigation the commission and accountants, examiners and agents, appointed by the commission for the purpose, shall be given free access to all books, books of account, documents, data and records of the public utility as well as of the corporation with which it is proposing to contract, which the commission may deem material to the investigation. The failure or refusal of either of the parties to the proposed contract to comply with this subsection is prima facie evidence that such contract is unfair, unreasonable and contrary to public interest, and is sufficient to justify a determination and finding of the commission to that effect, which has the same force and effect as any other determination or order of the commission. [Formerly 757.165; 1989 c.956 §6]

757.495 Contracts involving utilities and persons with affiliated interests. (1) When any public utility doing business in this state enters into any contract to make any payment, directly or indirectly, to any person or corporation having an affiliated interest, for service, advice, auditing, accounting, sponsoring, engineering, managing, operating, financing, legal or other services, or enter any charges therefor on its books, which shall be recognized as an operating expense or capital expenditure in any rate valuation or any other hearing or proceeding, the contract shall be filed with the Public Utility Commission within 90 days of execution of the contract. The contract shall be deemed to be executed on the date the parties sign a written contract or on the date the parties begin to transact business under the contract, whichever date is earlier.

(2) When any public utility doing business in this state shall enter into any contract, oral or written, with any person or corporation having an affiliated interest relating to the construction, operation, maintenance, leasing or use of the property of such public utility in Oregon, or the purchase of property, materials or supplies, which shall be recognized as the basis of an operating expense or capital expenditure in any rate valuation or any other hearing or proceeding, the contract shall be filed with the commission within 90 days of execution of the contract. The contract shall be deemed to be executed on the date the parties sign a written contract or on the date the parties begin to transact business under the contract, whichever date is earlier.

(3) When any such contract has been submitted to the commission, the commission promptly shall examine and investigate it. If, after such investigation, the commission determines that it is fair and reasonable and not contrary to the public interest, the commission shall enter findings and order to this effect and serve a copy thereof upon the public utility, whereupon any expenses and capital expenditures incurred by the public utility under the contract may be recognized in any rate valuation or other hearing or proceeding. If, after such investigation, the commission determines that the contract is not fair and reasonable in all its terms and is contrary to the public interest, the commission shall enter findings and order accordingly and serve a copy thereof upon the public utility, and, except as provided in subsection (4) of this section, it shall be unlawful to reco